On-site deployment involves:
Arrival (2-3 minutes):
- Position truck near material placement area
- Deploy outriggers for stability
- Level chassis using outrigger controls
Boom Setup (5-10 minutes):
- Extend boom sections to desired length
- Rotate boom to point toward placement area
- Adjust discharge angle
- Position trunk/end hose if equipped
Material Placement (continuous):
- Load hopper with ready-mix truck, loader, or other equipment
- Adjust belt speed to match material flow
- Monitor placement and adjust boom position as needed
Teardown (10-15 minutes):
- Retract boom sections
- Clean belt and hopper
- Stow outriggers
- Prepare for transport
Experienced crews can relocate and reset in under 5 minutes for multi-pour sites.
About Putzmeister TB-50 Telebelt: Made in America since 1997, Putzmeister Telebelts are the industry standard for telescopic belt conveyors. The company pioneered time-tested designs and continues to refine them based on contractor feedback. Every new Telebelt purchase includes comprehensive training, around-the-clock technical support, and access to the industry’s largest parts inventory.
About Putzmeister TB-50 Telebelt Unit
The specific Putzmeister TB-50 Telebelt model information may vary. Contact the seller for detailed specifications on the exact model year, hours, and condition. Always inspect equipment in person and consider hiring a professional inspection service before purchase.