The MG11C is designed for mobility with the plant components traveling on dedicated transport frames. Disassembly, transport, and re-erection typically require 3-5 days depending on distance and crew size. Equipment needed includes cranes for lifting major components, lowboy trailers for transport, and standard rigging equipment. Some components like the generator enclosure may travel on separate trailers. The plant will require new electrical connections, aggregate stockpile preparation, and cement silo installation at the new site. Many buyers hire specialized concrete plant erection companies to handle relocation and commissioning.
Additional Considerations
About This Specific Unit:
- Year: 2006 Erie Strayer MG11C
- Power: 609 kW generator with 1997 CAT 3412 (817 HP, 457 hours)
- Condition: Used, currently operating
- Location: Morrisville, Pennsylvania
- Upgrades: New Command Alkon controls, new mixer liner
- Status: Turn-key, ready for immediate relocation and operation
Important Notes for Buyers: Always conduct a thorough on-site inspection before purchase. Verify the condition of structural steel, weigh system calibration, mixer operation, and all mechanical components. Review maintenance records for both the plant and power unit. Consider hiring a batch plant consultant or engineer to assess the equipment. Obtain detailed component lists, electrical schematics, and operating manuals. Factor in relocation costs, site preparation requirements, and any necessary permits for operation at your location. Contact John at 215-428-3560 to arrange inspection and discuss specific configuration details for this plant.